$28.00
Laundry Bag are 27 1/2″ height and 15 1/2″ width. All sweet dreams products are hand crafted therefore size is slightly approximate.
Do not wash as burlap will shed. If stained can spot wash the broadcloth and straps. Do not leave in direct sunlight.