Eye Pillows

Traditional Satin Eye Pillow

$18.00

Description

Our high-quality aromatic handmade lavender eye pillows are individually sewn and filled with 100% organic flax seed and lavender flowers. The exterior fabric is made with traditional satin.

Each eye pillow contains a blend of organic lavender & flax seed. All eye pillows are microwave and freezer safe.

They are 3.5×7.5 (in) and are about ¾ (in) thick. All sweet dreams products are hand crafted therefore size is slightly approximate.

To Heat: place neck pillow in microwave and heat at 15 sec intervals on medium setting until it reaches desired temperature.
To Cool: place pillow in a ziplock plastic bag in the freezer until it reaches desired temperature.

Do not wash

Additional information

Weight0.4 lbs
Dimensions4 x 7.5 x .75 in

You may also like…